Last edited one month ago
by Max Mustermann

Air Purge System P+F 6000DV

Template:Infobox bms


1 Brief Introduction[edit | edit source]

The pressurized enclosure is one of most multifunctional applicable type of protection. It is based on a first flush operation which removes a potential, ignitable gas mixtures of the local environment from the enclosure. After the flush, the over-pressure will be maintained by adding as much pressurized air as necessary to compensate for the leaks of the enclosure or components. This constant over-pressure status protects against the diffusion of potentially explosive atmospheres. During the flush the internal pressure will be up to 10-12 mbar, in the operation phase it is reduced to 2-3 mbar. Hot spots at single components inside the enclosure are monitored by temperature sensors (optional) and if required turned off. This assures that no unacceptable surface temperature will occur.

2 Hardware Connection[edit | edit source]

File:Air Purge System P+F 6000DV HW Connection 1.jpgFile:Air Purge System P+F 6000DV HW Connection 2.jpgFile:Air Purge System P+F 6000DV HW Connection 3.jpg


3 Step-by-step Commissioning Guide[edit | edit source]

File:Air Purge System P+F 6000DV Panel.jpg

3.1 Basic Configuration[edit | edit source]

After starting the device for the first time, you have to set up a password

Use the Arrow keys to set the password: Push up, left, down, right and Push Start/Set to accept the password.

Take care not to set it wrong or different! Purge Settings

  • Units
  • Metric
  • Volume of Enclosure
  • Ask mechanics (Volume of Motor-cases minus the volume of the motors)
  • Purge Flow
  • 0,14m³/min = 140l/min (follow Data on Ex II 2G Ex px IIA T3 Gb X -Plate )
  • Number of Exchanges
  • 5
  • Vent Flow Control
  • One Vent / Two Vent according to installation (Two Vent if there are two EPV-6000-SS)
  • Environment
  • Gas
  • Pressures
  • Max Overpressure
  • 15mBar
  • Low Pressure
  • 1.00mBar
  • Min Overpressure
  • 0.62mBar
  • Operation Mode
  • FA
  • Operation Time
  • (Operation Time is calculated by Volume of Enclosure, Purge Flow and Number of Exchanges)

3.2 Digital Output Configuration[edit | edit source]

Output Settings

  • Output 1 Function
  • Any Alarm
  • Output 2 Function
  • Low Pressure Alarm

3.3 First Purging[edit | edit source]

- Look if Vent 1 (green LED) and Vent 2 (orange LED) light up if the Main-unit gets energized

File:Air Purge System P+F 6000DV Vents.JPG


- Start up with a closed Enclosure Pressure Valve and turn the Screwdriver in positive direction until the purging proceed start.

 If after purging the System show a fault you can open the valve more. (Open the Valve max. five turns into positive direction)
File:Air-Purge-Adjustment.jpg