Last edited 2 months ago
by Max Mustermann

GE11 Coupling Ring Installation

Template:Infobox bms

1 GE11 coupling ring installation steps for UNI-coupling[edit | edit source]

File:Kupplung.PNG

File:Kupplung2.PNG

1.1 Step 1[edit | edit source]

  • Place the coupling on the pipe and do the appropriate marking on both metal and plastic pipe.

File:Kupplung3.PNG

1.2 Step 2[edit | edit source]

  • Remove the supports from the cabinet.
  • Remove the clamps from the top pipe and move the top coupling ring completely to another side.
  • Now tighten the screw for the bottom pipe only.

File:Kupplung4.PNG



1.3 Step 3[edit | edit source]

  • As we can see the screws will touch the base of cabinets.
  • So cover the cabinet form inside and cut the srew as required.

Template:Notice bms

File:Kupplung5.PNG

File:Kupplung6.PNG

1.4 Step 4[edit | edit source]

  • Flip the screws for top coupling ring if required.
  • Bring back top coupling ring to its right position.
  • Start tightening the screw a little bit.
  • Install the clamps back to position on pipe with the supports.
  • Now tighten it until you get the correct Torque (40Nm) and follow same given NOTE.
  • Cut the screws if required.

File:Kupplung8.PNG