Template:Infobox bms
1 Protocol of electrical Training[edit | edit source]
File:BMS Training.jpg
Training Participants:
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
The above listed specialists were selected by buyer.
The training program is attached and each speailist has signed his received training.
The specialist had been working during the whole commissioning period with the trainer.
Therefore the most sufficient training was done on the job.
With the signature the specialist confirms that the training was sufficient and that he understood the explanations.
| Section
|
Topics
|
Duration/Date
|
Attendance
|
| Basic Engineering
|
1 IPC Overview
1.1 Drawings
1.3 Plc
1.4 PVSS
1.5 Communication PLC . PVSS
|
2.5 hours
Date: _______________________________________
|
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
|
| Drives
|
¶ 5 Maintenance
5.1 Drives
5.1.1 Sinamics Starter Drive Diagnostic
5.1.2 Sinamics Alarms and Warnings
5.1.3 Sinamics Replace Encoder Module / Encoder
5.1.4 Sinamics Replace CU
5.1.5 Sinamics Replace Motormodule / DC Unit
5.1.6 Vacon
5.1.7 POSMO A
|
3.0 hours
Date: _______________________________________
|
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
|
| ET200 / Temperature Controller
|
¶ 5.2 ET200
5.2.2 F-IO
5.3 Temperature Controller
5.3.1 PSG - Systemp Family
5.3.2 PSG - Flexotemp Family
|
3.0 hours
Date: _______________________________________
|
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
|
| IPC
|
¶ 5.4 IPC
5.4.1 UPS
5.4.2 Server
|
2.0 hours
Date: _______________________________________
|
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
|